Project Name/ location Name of Client & Address Name of Supervisor & Contact Scope of work performed  Start Date Completion Date Contract  Value in (Ksh.)

Gafuru Pan Tana River District

NWCPC Eng. S.G Mbugua
  • Excavation to form pan collection trenches, spillway all totaling to 9,800m3
  • Infiltration gallery to a well equipped with a hand pump.
  • Perimeter fence
  • One No. gate
  • Rip – rap and concrete sill done
  • One No. sign post
18/03/2009 08/04/2009 3.4 M
Ohiyo dam in Balambala Division  Garissa District Care International Kenya Eng. Phelix Okuta
  • Clearing the site
  • Distilling of the pan
  • Earthwork excavation or the silt traps
  • Earthwork excavation or the main pan
  • Excavation for the intake channels & spillways
  • Putting of sills /silt Basin
6/05/2009 15/06/2009 2.5 M
Titila Earth pan in Tana River District NALEP

Eng. T.M Makanga
Tel.0722223512

  • Excavation of reservoir 20,000m3, excavation of silt trap& concrete sills, collection trenches, watering through 7m long.
  • Infiltration gallery and installation of water pump.
24/10/2009 30/11/2009 8.08 M

Ijara 11 Water Pan
Ijara District

NWCPC NBI

G.K Cheriot
Tel.
0722576099

  • Excavation of reservoir 15000m3, silt trap concrete sills, collection trenches infiltration gallery and installation of water pump (afridev)
  • Construction of 2 sanitation units.
23/03/2010 08/06/2010 4.27 M
Kotile Irrigation Scheme in Ijara District NALEP NBI

Eng. Aden Shide
Tel. 0721848088

  • Bush clearing farm preparation (harrowing, ploughing, ridging, canals and construction of standard pump house)
10/02/2010 18/08/2010 20M
Togdub Water Pan- Lagdera District NALEP NBI

Mr. Okal J.
Tel. 0728679816

  • Bush clearing, excavation of main reservoir 50,000m3 silt trap, concrete sills, collection trenches infiltration gallery and Construction of cattle ramp and sanitation units
3/04/2011 10/06/2011 17M
Madeteni Earth Dam – Bamba Ganze District AMREF KENYA

ENG. J.M. OTENG
Tel. 0722987871

  • Bush clearing, excavation of main reservoir 30,000m3 silt trap concrete sills, collection trenches infiltration gallery and Construction of cattle ramp and sanitation units
  • Construction of infiltration chambers and communal water point
28/08/2011 6/10/2011 4.5M
Alabo Water Pan TSM International - Nairobi Mr. Omondi Tel: 0714237021
  • Bush clearing, excavation of main reservoir 20,000m3 , silt trap, concrete sills, collection trenches infiltration gallery and Construction of 2No cattle trough and sanitation units
6/04/2012 4/06/2012 7.9M
Maintenance of Harambee Estate Roads-Nairobi KURA – Nairobi Region Regional Manager – Kenya Urban Roads Authority Nairobi Region, Box 17956-00500, Nairobi
  •  Routine Maintenance
30/07/2012 29/11/2012 17.3M
Alabo Water Pan TSM International - Nairobi Mr. Omondi Tel: 0714237021
  • Bush clearing, excavation of main reservoir 20,000m3 , silt trap, concrete sills, collection trenches infiltration gallery and Construction of 2No cattle trough and sanitation units
6/04/2012 4/06/2012 7.9M
Construction of Agtalehel Water Pan Northern Water Service Board Engineer Lawrence Kinyua Tel: 0724-721979
  • Excavation of the main reservoir 10,000m3
  • Excavation of silt trap basin
  • Excavation of inlet/outlet channels
  • Filtering rip rap protections and gabions
18/02/2013 20/03/2013 5.8M
Construction of Ciakathura Earth dam PLAN International

Eng. Mbugua
Tel No.0720-813618

  • Construction of 20,000m3 earth pan
  • Construction of water kiosk
  • Construction of 2 No. cattle troughs
  • Construction of 2 units of 2 doors VIP latrines
25/03/2013 29/05/2013 10.1M
Construction of an office block in Nandi County County Director Nandi Regional engineer works
  • Construction of an office block of plaith area 150m2
15/04/2013 05/02/2014 26.72M
Dujis & Shimbrey Water Pans NWSB - Eng. Lawrence Imunti
  • Construction of 2 No. 20,000m3 earth pan
  • Construction of water kiosk
  • Construction of 2 No. cattle troughs
  • Construction of 2 units of 2 doors VIP latrines
  • Construction of 1No. elevated tank
25/08/2013 27/03/2014 24.37M
Extension Services to informal settlements in Malindi-lot 1 Kisumu Ndogo CWSB

Eng. D. Kanui
Tel: 0722662288

  • Excavation, laying and backfilling of trenches 14.1 km
  • Laying and jointing of pipes 14.1 km
  • Road crossing by cutting or micro tunneling(12m)
  • Construction of masory valve chambers complete with slab and access cover
  • Testing of pipes and valve chambers
  • Construction of 1 No water kiosk
  • Construction of 190 No Consumer connections to individual house hold.
  • Construction of 10 No Yard Taps
  • Construction of ablution blocks
  • Construction of office block plaith area 300m2
  • Commission of the work
15/08/2013 14/08/2014 103.7M

Mumias Informal
Settlement Infrastracture Improvement Works (Water & Sanitation Works)

Lake Victoria North Water Services Board Technical Service Manager – LVNWSB – Kakamega
  • Excavation, laying and backfilling of trenches 5893m of pipes of different diameters i.e. 110mm, 90mm, 50mm.
  • Laying and jointing of pipes 5893m
  • Road crossing by cutting or micro tunneling (12m)
  • Construction of masonry valve chambers complete with slab and access cover
  • Testing of pipes and valve chambers
  • Construction of 2No water kiosk
  • Construction of 200No Consumer connections to individual house hold.
  • Construction of 10No Yard Taps
  • Construction of 3No. ablution blocks
  • Commission of the work
20.11.2014 19.09.2015 60M
Machakos Town Settlement Infrastracture Improvement Works (Water & Sanitation Works) KISIP- Nairobi Project Coordinator- Nairobi
  • Construction of Water Supply Facilities including 250m3 steel elevated tank
  • Laying of 200mm steel pipe- 180M
  • Laying of 2700M distribution lines of dia 100mm
  • Construction of 200 consumer connection in form of yard taps and individual house hold connections
  • Construction of ND 400mm sewer line -1400m long
  • Construction of inspection chambers
  • Construction of solid waste stabilization facilities
  • Construction of 4No. ablution blocks in selected Schools in Machakos Town
05/11/2014 10/07/2016  102.89M
Naivasha Town Settlement Infrastracture Improvement Works (Water & Sanitation Works) KISIP- Nairobi Project Coordinator- Nairobi
  • Construction of Water Supply Facilities including 250m3 steel elevated tank - 2Nos.
  • Laying of 200mm steel pipe- 180M
  • Laying of 2700M distribution lines of dia 100mm
  • Construction of 200 consumer connection in form of yard taps and individual house hold connections
  • Construction of ND 400mm sewer line -1400m long
  • Construction of inspection chambers
  • Construction of solid waste stabilization facilities
  • Construction of 4No. ablution blocks in selected Schools in Naivasha Town
10/12/2014 15/12/2016 (Scheduled) 142.844M
client1.jpgclient2.jpgclient3.jpgclient4.jpgclient5.jpgclient6.jpgclient7.jpgclient8.jpgclient9.jpg

The Company

Fatah Construction and Civil Works Limited is founded in the Republic of Kenya as General building works, civil works and water resource .management Contractor.
It has recently rebranded and has been developed into a leading private company in the water industry offering solution to water problem.
Since its inception Fatah Construction and Civil Works Limited has gone through leaps and bound and immensely contributed to the Kenya economy through construction of dams, pans....Read More

Quick Contact

Fatah Construction & Civil Works Limited

HEAD OFFICE: Pioneer Kenyatta Avenue, Suite 106, Nairobi

BRANCH: Garissa Maendeleo Shopping Kismayu Road

POSTAL ADDRESS: P.O. Box 709-70100, Garissa

MOBILE: 254-722219982, 254-73508581

Gallery | Click to view photos

gallerygallerygallerygallerygallerygallerygallerygallerygallerygallerygallerygallery